Flint Is Getting $77 Million To Fix Water Infrastructure


Flint Michigan is getting $77 Million from the state to fix the city awful Water Infrastructure.

The Poisoned City: Flint’s Water and the American Urban Tragedy

These projects will help the short and long term sustainability of the water system in the city of Flint, but as stated in the Water Distribution Optimization Plan, the water system needs in excess of another $300 million in capital improvements over the next 20 years.” – Rob Bincsik,  Flint Department of Public Works Director

Here is a list of things Flint plans to do with the money

  • Completion of a pipeline hooking up to a secondary water source.
  • Improvements to the Dort and Cedar Street Reservoir and Pump Station.
  • Construction of a new chemical feed building.
  • Replacement of the Northwest Transmission Main.
  • Various water main replacement work.
  • Water meter replacements.
  • Water quality monitoring panels.

Try AmazonFresh Free Trial

Advertisements

Categories: Politics

Tagged as: , , ,

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.

%d bloggers like this: